| Year |
Project Description |
Location |
| 2010 |
Assisting the Employer during contract and unit-rate negotiations for the Barito River maintenance dredging campaign 2010. |
Banjarmasin, Indonesia |
| 2009 - 2010 |
Assisting the Project Consultant during prequalification, bid-process and sand-placing for the platform of a storage tank facility at Tanjung Bin, Johore. |
Johore, Malaysia |
| |
Re-scoping, new contract documents and technical/commercial negotiations for the capital dredging works of a new container port. |
Damietta, Egypt |
| 2009 |
Recommendations on dredging issues related to Risk assessment and traffic study deepening the approaches to Pasir Panjang Terminal. |
Singapore |
| 2008 |
Contract review for the dredging of the navigational channel to the Northern Factory Project. |
New Caledonia |
| 2004 - 2008 |
Advisory services to the management of a major Contractor on policy and strategy, equipment purchases and various dredging, reclamation and coastal protection projects. |
Malaysia |
| 2003 |
Reclamation of powerplant platform at Tanjong Bin. |
Johore, Malaysia. |
| |
Beach replenishment for Sanur Beach. |
Bali, Indonesia |
| 2001 |
Joint Venture Penta Ocean/ Koon/ DI/ Boskalis/ Ham for the Jurong 4/ Tuas View B reclamation and jetty construction. |
Singapore |
| |
The construction of the Jurong-Tuas Gas pipeline for Sembawang Gas. |
Singapore |
| 2000 |
Shore approach dredging and backfill for gas pipe line.
Maintenance Dredging for LNG channel.
The reclamation of the platform for Pelepas container port and deepening of entrance channel and turning circle.
|
Bintulu, Sarawak
Bintulu, Sarawak
Pelepas, Johore
|
| |
Maintenance dredging works. |
Bintulu, Sarawak |
| 1999 |
Capital dredging and reclamation works for LNG terminal. |
Bintulu, Sarawak |
| |
Joint Venture Penta Ocean / Koon/ Ham / DI /Boskalis for the Jurong 3B reclamation. |
Singapore |
| 1998 |
The reclamation of platform for a private port at Merak.
The deepening of container-port at Tanjong Perak, Surabaya
|
Merak, Indonesia
Surabaya, Indonesia
|
| 1995 - 1998 |
Various reclamation projects at Pulah Indah.
As Subcontractor for Penta Ocean for the reclamation of Jurong Island Phase 1A.
|
Klang, Malaysia
Singapore
|
| |
As Subcontractor Hyundai Construction for the reclamation of Changi B. |
Singapore |
| |
As Joint Venture partner of Penta Ocean/ Koon Construction for the reclamation of Tuas View. |
Singapore |
| 1991 - 1993 |
Land reclamation works at Tanjong Manis.
The dredging of shore approaches and backfill for two bundles of pipelines at respectively Bintulu and Miri.
|
Sarawak, Malaysia
Sarawak, Malaysia
|
| 1990 |
Sub Contractor of Sembawang Maritime/ Bechtel in charge of the rock protection works for the Pandan pipeline between Pulau Bukom and Pasir Panjang. |
Singapore |
| 1989 |
In charge of the extension of breakwaters. |
Bengkulu, Indonesia |
| 1988 |
Arranging financing through Netherlands Government for the extension of breakwaters. |
Bengkulu, Indonesia |
| 1987 |
Field investigations for channel deepening and design of breakwater extension. |
Bengkulu, Indonesia |
| 1984 - 1986 |
In charge of dredging, reclamation and the construction of two breakwaters. |
Bengkulu, Indonesia |
| 1983 |
Design of beach replenishment. |
Nusa Dua, Bali, Indonesia |
| 1982 |
Design and supervision of jetty construction. |
Malukku, Indonesia |
| 1981 |
Design of approach channel and breakwaters. |
Pulau Baai port, Bengkulu, Sumatra, Indonesia. |
| 1980 |
Design and supervision of dredging and reclamation works for LNG terminal.
Design extension of landing strip airport.
Design and supervision of retaining bunds for LNG tanks.
|
Bontang, Kalimantan, Indonesia |
| 1979 |
Design of reclamation. |
Kapuk, Cengkareng, Indonesia |
| 1978 |
Design of foreshore reclamation. |
Ancol, Jakarta Bay, Indonesia |
| 1977 |
Design and installation of the navigational aids. |
Cilacap port, Indonesia. |
| 1976 |
Training of Indonesian hydrographic surveyors. |
Indonesia |
| 1975 |
Supervision of dredging the navigational channel. |
Cilacap port, Indonesia. |